Six-burner gas range being serviced in the ExxonMobil headquarters kitchen, Victoria Island (photo stamped 22 October 2019)Commercial boiling pot beside a gas range in the ExxonMobil headquarters kitchen, Victoria Island (photo stamped 22 October 2019)Gas range and prep table being serviced in the ExxonMobil headquarters kitchen, Victoria Island (photo stamped 22 October 2019)Cooking line under the extraction hood in the ExxonMobil headquarters kitchen, Victoria Island (photo stamped 22 October 2019)Technicians inspecting the cooking line in the ExxonMobil headquarters kitchen, Victoria Island (photo stamped 22 October 2019)Deep fryer maintenance in the ExxonMobil headquarters staff kitchen, Victoria Island (March 2017)Technicians working on a twin-tank fryer in the ExxonMobil headquarters staff kitchen, Victoria Island (March 2017)Fryer, boiling vessel and combi oven serviced in one visit, ExxonMobil headquarters, Victoria Island (March 2017)Floor-standing food boilers in the ExxonMobil headquarters staff kitchen, Victoria Island (March 2017)Cooking line, extraction hood and combi oven, ExxonMobil headquarters kitchen, Victoria Island (March 2017)ExxonMobil headquarters staff kitchen cleared and ready for service, Victoria Island (March 2017)Industrial gas ranges under repair, ExxonMobil headquarters kitchen, Victoria Island (March 2017)Technician working under a multi-burner wok range, ExxonMobil headquarters kitchen, Victoria IslandBurner and drip tray servicing on a commercial gas range, ExxonMobil headquarters kitchen, Victoria Island
Three-deck commercial baking oven being installed, with its shipping crateInstallation team commissioning a three-deck baking ovenConnection checks behind a newly installed deck ovenFinal checks on the deck oven before handoverBakery kitchen with the deck oven installed and the gas burner connected
Cylinders connected to regulators on a reinstalled gas line (January 2017)Cylinder bank with regulator and gauge on a reinstalled gas line (January 2017)Gas cylinders in a steel cage with a flammable-gas warning sign (photo stamped 22 October 2019)Cylinder in position for an industrial kitchen gas installation, Lagos (May 2017)Technicians connecting a large cylinder to a new kitchen gas lineOutdoor cylinder position with the gas line run along the wallGas line installation in progress along a side passageCylinders and regulator installed beside a fire point signCylinder bank being connected along the side of a buildingCylinder bank with pipework running into the buildingGas hose and isolation valve at the kitchen wall entryGas supply entering the kitchen through a tiled wallBuilt-in gas and electric hobs installed in a home kitchenGlass-top gas hob installed in a fitted kitchen
School renovation, Afrogramms, Abeokuta (Ogun State)
Completed "White House" building at Afrogramms, Abeokuta, marked 30/10/2012Two-storey block on completion at Afrogramms, Abeokuta, marked 30/10/2012Completed toilet block at the bungalow, Afrogramms, Abeokuta, marked 30/10/2012School block after renovation, with new louvred windows and fresh renderRenovated side elevation of a school buildingBoys' hostel at Afrogramms, Abeokuta with the roof stripped for replacementBoys' hostel before renovationInside the boys' hostel with the roof removedOld roof timbers stripped from the science laboratory buildingNew roof structure going onto the science laboratoryDoor and window works inside the science laboratory buildingFitting new window shutters on the science laboratory buildingSchool building with the old roof stripped for renovationNew roof trusses being erected over a school blockRoofing sheets being laid over new trussesNew eaves, fascia and window shutters on a school blockReplacing window shutters on a school blockSchool renovation in progress, with the site marked offCeiling works in the classroom building corridorNew toilet fittings in a renovated toilet block
Foundation works for a classroom block (January 2017)Setting out and levelling the classroom block slabFormwork around the new classroom block slabFirst courses of blockwork on the new classroom blockBlockwork walls rising on the classroom blockLintel and roof-beam formwork on the classroom blockSite works around the classroom blockInterior finishing in the new classroomCompleted classroom blockFinished entrance with a stainless-steel security door
LG front-loading washing machine brought in for repairWashing machine with the rear panel ready for drum and pump accessTop-loading washing machine installed with its water and drain connectionsLG condenser tumble dryer opened up for repairTumble dryer installed and tested in a new laundry room